Project Overview
A flagship multi-stage logistics infrastructure project executed for Rajdhani Transport Corporation. This mega pre-engineered logistics terminal features high-clearance bays, heavy-duty structural steel columns, robust column footing, and large portal frame spans engineered to facilitate simultaneous truck docking, loading, and high-density racking.
Project Highlights & Scope:
- Phase-by-Phase Execution: Site excavation, structural column footing, heavy truss fabrication, column erection, and high-tensile roof sheeting.
- Client: Rajdhani Transport Corporation.
- Logistics Optimization: High eaves height accommodating modern multi-tier racking systems and forklifts.
- Floor Load Capacity: Heavy-duty reinforced base engineered for high-axle vehicle traffic.
- Weather Resistance: Anti-corrosive industrial coatings and leak-proof mechanical crimped roofing.
Photo Gallery
Video Walkthroughs
Need a similar project done?
Let's discuss your requirements and design a customized engineering solution for you.
Get a Quote